Publications before 2000

Books (chapters, editions)

  1. FINKE G. A Unified Approach to Reshipment, Overshipment and Post-Optimization Problems. In Lecture Notes in Control and Information Sciences, Springer-Verlag, Berlin, Vol. 7, Optimization Techniques, Part 2 (1978) 201-208.
  2. CAMPELLO R., FINKE G. (EDITORS). Special issue of Discrete Applied Mathematics, Vol 18. Proc. School on Combinatorial Optimization, Rio de Janeiro 1985. North-Holland (1987). ISBN 0.444.70136.2.
  3. FINKE G., KUSIAK A. Selection of Process Plans in Automated Manufacturing Systems. In A.A. Desrochers (Ed.), Modeling and Control of Automated Manufacturing Systems, IEEE Computer Society Press (1990) 359-364. ISBN 0.8186.8916.1.
  4. FINKE G. Planning and scheduling. In H. H. Adelsberger, J. Lazansky, V. Marik (Eds). Information Management in Computer Integrated Manufacturing. Lecture Notes in Computer Science 973. Springer (1995) 165-178. ISBN 3-540-60286-0.
  5. BLAZEWICZ J., PAWLAK G., ESPINOUSE M.-L., FINKE G. Scheduling Tasks and Vehicles in FMSs – Network Flow Model. In K. Inderfurth, G. Schwödiauer, W. Domschke, F. Juhnke, P. Kleinschmidt, G. Wäscher (Eds). Operations Research Proceedings 1999 (Selected Papers SOR'99). Springer (1999) 349-353. ISBN 3-540-67094-7.
  6. FINKE G., BRAUNER N. Scheduling in Robotic Cells. In K. Inderfurth, G. Schwödiauer, W. Domschke, F. Juhnke, P. Kleinschmidt, G. Wäscher (Eds). Operations Research Proceedings 1999 (Selected Papers SOR'99). Springer (1999) 372-377. ISBN 3-540-67094-7.

Journals

  1. FINKE G. Eine Klasse von Antiautomorphismen in rechts-geordneten Gruppen. Abhandlungen aus dem mathematischen Seminar der Unversität Hamburg 37, Heft 1/2 (1972) 68-78.
  2. FINKE G. Längengruppen in angeordneten Ebenen mit freier Beweglichkeit. Abhandlungen aus dem mathematischen Seminar der Universität Hamburg 39 (1973) 154-163.
  3. AHRENS J.H., FINKE G. Degeneracy in Fixed Cost Transportation Problems. Mathematical Programming 8, N° 3 (1975) 369-374.
  4. FINKE G. The Pure Fixed Cost Distribution Problem. Congressus Numerantium XVI (1975) 305-318.
  5. AHRENS J.H., FINKE G. Merging and Sorting Applied to the Zero-One Knapsack Problem. Operations Research 23, N° 6 (1975) 1099-1109.
  6. FINKE G. The Lower Bounded and Upper Unbounded Distribution Model. Congressus Numerantium XIX (1977) 279-289.
  7. FINKE G., SMITH P.A. Primal Equivalents to the Threshold Algorithm. Operations Research Verfahren 31 (1978) 185-198.
  8. FINKE G., AHRENS J.H. A Variant of the Primal Transportation Algorithm. INFOR 16, 1 (1978) 35-46.
  9. FINKE G. A Modified Bounded Variable Algorithm. Congressus Numerantium XXVII (1979) 193-199.
  10. FINKE G. Bottleneck Problems with Overshipments. Operations Research Verfahren 40 (1980) 307-310.
  11. AHRENS J.H., FINKE G. Primal Transportation and Transshipment Algorithms. Zeitschrift für Operations Research 24 (1980) 1-32. Invited survey.
  12. FINKE G. Overshipments in Linear Network Problems. Methods of Operations Research 43 (1981) 205-215.
  13. FINKE G., RÖCK H. A Primal Algorithm for a Class of Minimax Network Flow Problems. Methods of Operations Research 45 (1982) 221-232.
  14. FINKE G. Multiple Assignment Problems. Pesquisa Operacional 2, N° 2 (1982) 17-28.
  15. FINKE G. Minimizing Overshipments in Bottleneck Transportation Problems. INFOR 21, N° 2 (1983) 121-125.
  16. FINKE G. Bulk Shipment Formulations for the Traveling Salesman Problem. Methods of Operations Research 51 (1983) 247-256.
  17. FINKE G., CLAUS A., GUNN E. A Two-Commodity Network Flow Approach to the Traveling Salesman Problem. Congressus Numerantium 41 (1984) 167-178.
  18. SEBEDIO J.L., FINKE G., ACKMAN R.G. Reactivities of Highly Unsaturated Fatty Acids for the Hydrogenation on Nickel Catalyst. Chemistry and Physics of Lipids 34 (1984) 215-225.
  19. FINKE G., KUSIAK A. Network Approach to Modelling of Flexible Manufacturing Modules and Cells. RAIRO, APII 19, N° 4 (1985) 359-370.
  20. FINKE G., BURKARD R.E., RENDL F. Quadratic Assignment Problems. Annals of Discrete Mathematics 31 (1987) 61-82.
  21. FINKE G., AHMED S. Network Flow Methods for the Asymmetric Traveling Salesman Problem. Congressus Numerantium 57 (1987) 223-234.
  22. BLAZEWICZ J., FINKE G. Minimizing Mean Weighted Execution Time Loss on Identical and Uniform Processors. Information Processing Letters 24, N° 4 (1987) 259-263.
  23. KUSIAK A., FINKE G. Modeling and Solving the Flexible Forging Module Scheduling Problem. Engineering Optimization 12 (1987) 1-12.
  24. FINKE G., KUSIAK A. Models for the Process Planning Problem in Flexible Manufacturing Systems. International Journal of Advanced Manufacturing Technology 2, N° 2 (1987) 3-12.
  25. KUSIAK A., FINKE G. Hierarchical Approach to the Process Planning Problem. Discrete Applied Mathematics 18 (1987) 175-184.
  26. KUSIAK A., FINKE G. Selection of Process Plans in Automated Manufacturing Systems. IEEE Journal of Robotics and Automation 4, N° 4 (1988) 397-402.
  27. BLAZEWICZ J., FINKE G., HAUPT R., SCHMIDT G. New Trends in Machine Scheduling. European Journal of Operational Research, EJOR 37, N° 2 (1988) 1-15. Invited Review.
  28. FINKE G., MEDOVA-DEMPSTER E. Combinatorial optimization problems in trace form. Ricerca Operativa 52 (1989) 37-61.
  29. BLAZEWICZ J., EISELT H.A., FINKE G., LAPORTE G., WEGLARZ J. Scheduling tasks and vehicles in a flexible manufacturing system. International Journal of Flexible Manufacturing Systems 4 (1991) 5-16.
  30. BLAZEWICZ J., FINKE G., LAPORTE G., WEGLARZ J. Dynamic programming algorithm for a FMS scheduling problem. Bulletin of the Polish Academy of Sciences, Technical Sciences, Vol. 39, n° 2 (1991) 345-350.
  31. BLAZEWICZ J., BURKARD R.E., FINKE G., WOEGINGER G.J. Vehicle scheduling in two-cycle flexible manufacturing systems. Mathematical and Computer Modelling 20, N° 2 (1994) 19-31.
  32. BLAZEWICZ J., FINKE G. Scheduling with resource management in manufacturing systems. EJOR 76 (1994) 1-14. Invited Review.
  33. PRIVAULT C., FINKE G. Modelling a tool switching problem on a single NC-machine. Journal of Intelligent Manufacturing 6 (1995) 87-94.
  34. PRIVAULT C., FINKE G. Ordonnancement avec statégies de remplacement d’outils sur une machine. Scheduling with tool replacement stategies on a single machine. Journal Européen des Systèmes Automatisés, RAIRO - APII - JESA 30, N° 6 (1996) 781-799.
  35. FINKE G., JIANG H. A Variant of the Permutation Flow Shop Model with Variable Processing Times. Discrete Applied Mathematics 76 (1997) 123-140.
  36. CRAMA Y., DUPONT L., FINKE G. Recherche opérationnelle et gestion de la production. Revue N.S.T. - Nouvelles de la Science et des Technologies, Belgique, 15, N° 2/3/4 (1997) 37-45.
  37. BLAZEWICZ J., FINKE G., ESPINOUSE M.-L., PAWLAK G. Scheduling vehicles in a cyclic flexible flowshop. European Journal of Automation – JESA, 32, N° 4 (1998) 441-452.
  38. BRAUNER N., FINKE G., GUEGUEN C. Flow-shop robotisé monoproduit avec stockage. European Journal of Automation – JESA, 32, N° 7-8 (1998) 875-891.
  39. DROR M., FINKE G., GRAVIER S., KUBIAK W. On the complexity of a restricted list-coloring problem. Discrete Mathematics 195 (1999) 103-109.
  40. BRAUNER N., FINKE G. On the conjecture in robotic cells: New simplified proof for the three-machine cell. Journal of Information Systems and Operational Research – INFOR 37, no 1 (1999) 20-36.

Conference Proceedings

  1. FINKE G. Une méthode de post-optimisation pour le problème de transport. Proc. CAAS Conference, Université Laval (1976).
  2. FINKE G., AHRENS J.H., MARFELS C. A Model of Change in Industrial Structure. Proc. CAAS Conference, Fredericton (1977).
  3. KUSIAK A., FINKE G. The Process Plan Selection Problem. Proc. IEEE International Conf. on Robotics and Automation, San Francisco (1986) 1826-1830.
  4. FINKE G. Network Flow Based Branch and Bound Method for Asymmetric Traveling Salesman Problems. Methods of Operations Research 57, Proc. XI Symposium on Operations Research, Darmstadt (1986) 117-119.
  5. FINKE G., KUSIAK A. Combinatorial Models for the Process Planning Problem in Flexible Manufacturing Systems. Actes des Journées 20e anniversaire du groupe combinatoire, AFCET, INRIA - Rocquencourt (1986) 227-240.
  6. FINKE G. Practical Network Methods to Solve TSP. Proc. International Conference on Optimization: Techniques and Applications, ICOTA, Singapore (1987) 1097-1103.
  7. FINKE G. Flexible manufacturing systems in the framework of resource constrained scheduling theory. Methods of Operations Research 60, Proc. XIII Symposium on Operations Research, Paderborn (1988) 205-207.
  8. FINKE G. Traveling salesman problem and routing problems: approach by multi-commodity network flows. Actes des Journées du Laboratoire d’Informatique de Paris-Nord. Villetaneuse (1989) 141-147.
  9. FINKE G. Modèles de recherche opérationnelle dans les ateliers flexibles. Actes de la Deuxième Rencontre Franco-Algérienne de Recherche Opérationnelle. Alger, 1990.
  10. BLAZEWICZ J., FINKE G. An integrated system for scheduling machines and vehicles in an FMS. Proc. IEEE International Conference on Robotics and Automation. Sacramento (1991) 1784-1788.
  11. PRIVAULT C., FINKE G. Tool management on NC-machines. Proc. International Conference on Industrial Engineering and Production Management. Vol.II, IEPM’93, Mons, Belgique (1993) 667-676.
  12. PRIVAULT C., FINKE G. Gestion on-line des changements d’outils sur une machine flexible. Actes du 1er Congrès Biennal de l’AFCET. Vol. 1, Aide à la Décision et Recherche Opérationnelle. Versailles (1993) 175-184.
  13. FINKE G., DUPONT L. Combinatorics of cyclic assembly systems. Proc. IEEE International Conference on Systems, Man and Cybernetics, Vol. 4, Le Touquet (1993) 297-301.
  14. FINKE G., JIANG H. Permutation flow-shops with state-dependent processing times. Proc. Int. Conf. on Industrial Engineering and Production Management, Vol. I, Marrakech (1995) 285-294.
  15. FINKE G., GUEGUEN C., BRAUNER N. Robotic cells with buffer space. Proceedings ECCO IX, Dublin 1996.
  16. PRIVAULT C., FINKE G. Generalized K-Server Problem with Application to Manufacturing Systems. Proc. II ALIO/EURO Workshop on Practical Combinatorial Optimization, Valparaiso (1996) 53-70.
  17. BLAZEWICZ J., FINKE G., ESPINOUSE M.-L., PAWLAK G. Scheduling vehicles in a cyclic flowshop. Proc. International Conference on Industrial Engineering and Production Management (IEPM’97), Lyon (1997) I-611-619.
  18. BRAUNER N., FINKE G. Cyclic Scheduling in a Robotic Flowshop. Proc. International Conference on Industrial Engineering and Production Management (IEPM’97), Lyon (1997) I-439-449.
  19. FULCONIS M., DUPONT L., FINKE G. Social Impact of Flexible Working Hours: Analysis of Several Agreements in the Factories of Renault. Proc. 30th Int. Symposium on Automative Technology and Automation, Florence (1997) 271-277.
  20. BLAZEWICZ J., ESPINOUSE M.-L., FINKE G., PAWLAK G. Scheduling Tasks and Vehicles in a cyclic FMS. Proc. Fourth International Symposium on Methods and Models in Automation and Robotics, Miedzyzdroje, Pologne (1997) 1065-1070.
  21. FINKE G., ESPINOUSE M-L., JIANG H. Flowshops and Extensions. Proc. IFAC/IFIP Conference on Management and Control of Production and Logistics (MCPL’97), Campinas, Brazil (1997) 233-238.
  22. VERNADAT F., BRUN-PICARD D., CETNAROWICZ E., DOURADO A., FINKE G., FUJII S., LAMPING R., PASSOS C.A.S., SICHMAN J.S. Management and Control of Modern Manufacturing Organisations: An Interdisciplinary Approach. Panel Session Report, Proc. IFAC/IFIP Conference on Management and Control of Production and Logistics (MCPL’97), Campinas, Brazil (1997) 625-628.
  23. BRAUNER N., DHAENENS-FLIPO C., ESPINOUSE M.-L., FINKE G., GAVRANOVIC H. Decomposition into parallel work phases with application to the sheet metal industry. In Proceedings International Conference on Industrial Engineering and Production Management (IEPM’99), Glasgow (1999), Book 1, 389-396.
  24. BRAUNER N., FINKE G. Optimal moves of the material handling system in a robotic flow-shop. In Proceedings International Conference on Industrial Engineering and Production Management (IEPM’99), Glasgow (1999), Book 1, 409-417.
  25. DHAENENS-FLIPO C., LANDRIEU A., BINDER Z., FINKE G. Coordination of Manufacturing and Distribution: Two Industrial Examples. Proc. 14th World Congress of International Federation of Automatic Control (IFAC), Beijing (1999), Vol. A, 343-347.
  26. DROR M., FINKE G., GRAVIER S., KUBIAK W. On the complexity of a restricted list-coloring problem. Centre de Recherches Mathématiques – CRM. Proceedings and Lecture Notes, Volume 23, Montréal (1999) 35-41.

Others publications and reports

  1. FINKE G. Längengruppen in angeordneten Ebenen mit transitiver Bewegungsgruppe. Ph.D. diss., Universität Kiel, 1969.
  2. FINKE G., MEDOVA-DEMPSTER E. Combinatorial optimization problems in trace form. Université de Pise, Sezione di Matematica Applicata, Vol. 160 (1988).
  3. FINKE G. Book Review: Vehicle Routing : Methods and Studies by B.L. Golden and A.A. Assad (Elsevier Science Publisher B.V. 1988). INFOR - Information Systems and Operational Research 26, 4 (1988) 317-319.
  4. BLAZEWICZ J., BURKARD R.E., FINKE G., WOEGINGER G.J. Vehicule scheduling in two-cycle flexible manufacturing systems. Report 237, Technische Universität Graz, Austria, Octobre 1992.
  5. FINKE G. Book Review: Scheduling in Computer and Manufacturing Systems by J. Blazewicz et al. (Springer 1993). EJOR 71 (1993) 147-148.
  6. BRAUNER N., FINKE G. On the conjecture in robotic cells: New simplified proof for the three-machine cell, Rapport de Recherche RR 971-I, LEIBNIZ-IMAG, Grenoble, 1997.
  7. BRAUNER N., FINKE G, GUEGUEN C. Optimal cyclic production in a robotic flow-shop with buffers. Rapport de Recherche RR 982-I, LEIBNIZ-IMAG, Grenoble, 1997. (Version révisée, Mai 1998.)
  8. DROR M., FINKE G., GRAVIER S., KUBIAK W. Sur la complexité d’un problème restreint de coloration par liste. Rapport Technique RT 172, LEIBNIZ-IMAG, Grenoble, 1997.
  9. REZIG W., FINKE G. Méthode de décomposition décentralisée pour le biflot entier de coût minimum. Rapport de Recherche RR 1000-I, LEIBNIZ-IMAG, Grenoble, 1998.
  10. DHAENENS-FLIPO C., FINKE G. An integrated model for an industrial production-distribution problem. Rapport de Recherche RR 1006-I, LEIBNIZ-IMAG, Grenoble, 1998.
  11. BRAUNER N., FINKE G. On cycles and permutations in robotic cells. Technical Report RR 1010-I, LEIBNIZ-IMAG, Grenoble, 1999.
  12. BOUDHAR M., FINKE G. Étude de quelques problèmes d'ordonnancement sur des machines à traitement par batch avec des contraintes d'incompatibilité entre les tâches (problèmes difficiles). Rapport de recherche n° 003/99, Institut de Mathématiques, USTHB, Alger.
  13. BOUDHAR M., FINKE G. Étude de quelques problèmes d'ordonnancement sur des machines à traitement par batch avec des contraintes d'incompatibilité entre les tâches (problèmes polynomiaux). Rapport de recherche n° 004/99, Institut de Mathématiques, USTHB, Alger.
  14. BLAZEWICZ J., COFFMAN E., ECKER K., FINKE G. (Editors). Scheduling in Computer and Manufacturing Systems. Dagstuhl-Seminar Report 256, 1999.

Conferences

  1. AHRENS J.H., FINKE G. Merging and Sorting to the Zero-One Knapsack Problem.44th ORSA Meeting, San Diego (1973).
  2. FINKE G. The Pure Fixed Cost Distribution Problem. Fifth Manitoba Conference on Numerical Mathematics, Winnipeg (1975).
  3. FINKE G. The Lower Bounded and Upper Unbounded Distribution Model. Eighth Southeastern Conference on Combinatorics, Graph Theory and Computing, Baton Rouge (1977).
  4. FINKE G. Une méthode unifiée pour les problèmes de redistribution, distribution avec surplus et post-optimisation. Journées de l’Optimisation, Montréal (1977).
  5. FINKE G. A Unified Approach to Reshipment, Overshipment and Post-Optimization Problems. 8th IFIP Conference on Optimization Techniques, Würzburg (1977).
  6. FINKE G., SMITH P.A. Primal Equivalents to the Threshold Algorithm. Third Symposium on Operations Research, Mannheim (1978).
  7. FINKE G. A Primal Equivalent to the Threshold Algorithm. 20th Annual Conference, Canadian Operational Research Society, Vancouver (1978).
  8. FINKE G. A Modified Bounded Variable Algorithm. Ninth Manitoba Conference on Numerical Mathematics and Computing, Winnipeg (1979).
  9. FINKE G. Bottleneck Problems with Overshipments. Fifth Symposium on Operations Research, Köln (1980).
  10. FINKE G. The Bottleneck Time Function. International Congress on Mathematical Programming, Rio de Janeiro (1981).
  11. FINKE G. Multiple Assignment Problems. Ninth IFORS International Conference on Operations Research, Hamburg (1981).
  12. FINKE G. Overshipments in Linear Network Problems. Sixth Symposium on Operations Research, Augsburg (1981).
  13. FINKE G. Bottleneck Transportation Problems. Annual CORS Conference, Montreal (1982).
  14. FINKE G. The More for Less Phenomenon in Capacitated Network Models. Optimization Days, Montreal (1982).
  15. SEBEDIO J.L., FINKE G., ACKMAN R.G. Selectivity of Nickel Catalyst for the Hydrogenation of Highly Unsaturated Marine Oils. Meeting of American Oil Chemists Society, Toronto, (1982).
  16. FINKE G. Network Problems with Excess Flow. EURO V - TIMS XXV, Lausanne (1982).
  17. FINKE G., RÖCK H. A Primal Algorithm for a Class of Minimax Network Flow Problems. Seventh Symposium on Operations Research, St. Gallen (1982).
  18. FINKE G., CLAUS A., GUNN E. A Two-Commodity Network Flow Approach to the Traveling Salesman Problem. 14th Southeastern Conference on Combinatorics, Graph Theory, and Computing, Boca Raton (1983).
  19. FINKE G. Threshold Techniques for Nonlinear Network Flow Problems. 6th European Congress on Operations Research, Vienna (1983).
  20. FINKE G. Bulk Shipment Formulations for the Traveling Salesman Problem. Eighth Symposium on Operations Research, Karlsruhe (1983).
  21. FINKE G., BURKARD R.E., RENDL F. Eigenvalue Approach to Quadratic Assignment Problems. Ninth Symposium on Operations Research, Osnabrück (1984).
  22. FINKE G. Développements récents du problème de voyageur de commerce : approche par les flots. Journée du groupe combinatoire de l’AFCET, Université Paris VI (1984).
  23. FINKE G., KUSIAK A. Network Approach to Modelling of Flexible Manufacturing Modules and Cells. Conference on Production Systems: Scientific, Economic, Strategic Approach, INRIA, Paris (1985).
  24. FINKE G. Quadratic Assignment Problems. School on Combinatorial Optimization, Rio de Janeiro (1985). (Series of tutorial lectures)
  25. FINKE G., AHMED S. Network Flow Methods for the Asymmetric Traveling Salesman Problem. 17th Southeastern International Conference on Combinatorics, Graph Theory and Computing, Boca Raton (1986).
  26. FINKE G. Combinatorial Optimization Models for Process Planning Problems. Annual CORS Conference, Toronto (1986).
  27. FINKE G. A Two Commodity Network Approach to Constrained Traveling Salesman Problems. ORSA/TIMS National Meeting, Miami Beach (1986).
  28. FINKE G. Combinatorial Optimization Problems Viewed as Matrix Approximation Problems. Meeting on Combinatorial Optimization and its Relations to Other Mathematical Areas, Oberwolfach (1986).
  29. FINKE G., MEDOVA-DEMPSTER E.A. Combinatorial Optimization Problems in Trace Form. Conference on Combinatorial Matrix Analysis, Victoria, B.C. (1987).
  30. FINKE G. Traveling Salesman Problems on Circulant Matrices. Second Avanced Research Institute on Discrete Applied Mathematics, Rutgers, N.J. (1987).
  31. FINKE G., CHRISTOFIDES N., PEREIRA DE LUCENA A. Complementary Two-Commodity Flows. ÖGOR-SVOR-Tagung, Graz (1987).
  32. FINKE G. Exact Solution Methods for Quadratic Assignment Problems: The Search for Better Lower Bounds. CORS Conference Montreal (1988).
  33. FINKE G. Complementary Two-Commodity Flows: Formulations for TSP, m-TSP and Vehicle Routing Problems. Meeting on Computational Aspects of Combinatorial Optimization, Oberwolfach (1989).
  34. MAHEY P., FINKE G. Decomposition of optimal two-commodity networks: application to the TSP. EURO X, Belgrade, Yougoslavie (1989).
  35. DESCOTTE Y., FINKE G., RECHENMANN F., ZIEBELIN D. Artificial intelligence based production scheduling systems developed in France. Symposium on Operations Research, Universität Ulm (R.F.A.), Sept. 6-8, 1989.
  36. FINKE G. Combinatorial Optimization using Trace and Frobenius-Norms. Workshop on Nondifferentiable Optimization and Applications, University of Karlsruhe (1989).
  37. FINKE G. Operations Research Models in Automated Production Systems. XXII Congrès Brésilien de Recherche Opérationnelle, Fortaleza, Brésil (1989). (Plenary speaker).
  38. FINKE G. O.R. in flexible manufacturing systems. Jahrestagung der Schweizerischen Vereinigung für Operations Research, Bern (1989). (Plenary speaker).
  39. BLAZEWICZ J., EISELT H.A., FINKE G., LAPORTE G., WEGLARZ J. Scheduling Tasks and Vehicles in a Flexible Manufacturing System. European Club on Combinatorial Optimization, Barcelone (1990).
  40. FINKE G. Low rank permutation problems. European Club on Combinatorial Optimization, Barcelone (1990).
  41. FINKE G. Combinatorial optimization models in automated manufacturing. 12th Triennial Conference on Operations Research, Athènes, 25-29 juin 1990.
  42. BLAZEWICZ J., BURKARD H., FINKE G. Scheduling tasks and vehicles in a two cycle FMS. 11th European Congress on Operational Research, Aachen (1991).
  43. PRIVAULT C., FINKE G. Gestion d’outils sur machines à commandes numériques. Rencontres Franco-Suisses de Recherche Opérationnelle, Paris (1991).
  44. FINKE G., DUPONT L. Systèmes d’assemblage cycliques. Rencontres Franco-Suisses de Recherche Opérationnelle, Paris (1991).
  45. FINKE G., PRIVAULT C. General server problems with application to manufacturing and paging. Conference of the European Chapter on Combinatorial Optimization. ECCO V, April 13-15, Graz (1992).
  46. REZIG W., FINKE G. Une méthode de décomposition pour le problème du biflot. 3ème Rencontre Franco-Algérienne de Recherche Opérationnelle, Alger, 8-12 mai 1992.
  47. BOURAS A., FINKE G. Problème d’affectation quadratique. Application aux matrices de rang 1. 3ème Rencontre Franco-Algérienne de Recherche Opérationnelle. Alger, 8-12 mai 1992.
  48. FINKE G., BLAZEWICZ J., BURKARD R.E., WOEGINGER G.J. Scheduling in FMS with multi-cycle transportation systems. EURO XII / TIMS XXXI joint International Conference, June 29 - July 1, Helsinki, Finland (1992).
  49. FINKE G., PRIVAULT C. Server problems with bulk request. Journées de l’Optimisation, Montréal, 12-24 mai, 1993.
  50. FINKE G., BOURAS A. Remarks on eigenvalue related bounds for the QAP. Workshop on Quadratic Assignment and Related Problems. DIMACS, Rutgers, New Jersey. Mai 20-21, 1993.
  51. FINKE G. Scheduling with resource management I. CORS Conference, Halifax, May 25-27, 1993.
  52. FINKE G. Scheduling with resource management II. Scheduling Workshop, Halifax, May 27, 1993.
  53. BLAZEWICZ J., BURKHARD R.E., FINKE G., WOEGINGER G.J. Vehicle scheduling in 2-cycle flexible manufacturing systems. ORSA/TIMS, Phoenix, Arizona, Oct 31- Nov 3, 1993.
  54. ALLAB S., FINKE G. Deadline scheduling in job categories. ECCO VII, Milan, 1994.
  55. FINKE G. Scheduling with resource management. EURO-Tenth EURO Summer Institute (Comb. Optimization). Groupe HEC, France 1994.
  56. FINKE G., JIANG H. A variant of the permutation flow-shop model. Second Int. Colloquium on Graphs and Optimization, Loëche-Les-Bains, Switzerland, 1994.
  57. FINKE G. Scheduling models with variable processing times. ECCO VIII, Poznan, Poland, 8-10 mai 1995. (Plenary speaker).
  58. REZIG W., FINKE G. Problèmes de multiflots continus et entiers. FRANCORO, Mons, 11-14 juin 1995.
  59. FINKE G. General flow shop models: from job overlap to job deterioration. Int. Conference on Scheduling in Computer and Manufacturing Systems, Dagstuhl - Research Center for Computer Science, 15-19 mai 1995.
  60. BOURAS A., FINKE G. Sur la complexité du problème d’affectation quadratique de rang1. 3ème journées du groupe MODE, Brest 1995.
  61. BOURAS A., FINKE G. Cas particuliers du problème d’affectation quadratique. Journées Graphes et Combinatoire, Aussois 1995.
  62. FINKE G., PRIVAULT C. Generalized server problems with application to scheduling in manufacturing systems. EURO XIV, Jerusalem, 3-6 juillet 1995.
  63. BLAZEWICZ J., FINKE G., PAWLAK G. Scheduling Multiple Stage FMS with AGV Routing. INFORMS, New Orleans, Oct. 29- Nov. 1, 1995.
  64. FINKE G., ESPINOUSE M.-L. Flow Shop Models with Generalized Precedence Constraints. Journées de l’Optimisation, Montréal, 13-15 mai 1996.
  65. FINKE G. Combinatorial Optimization Models in Flexible Manufacturing Systems. II ALIO/EURO Workshop on Practical Combinatorial Optimization, Valparaiso, Nov. 11-15, 1996. (Tutorial)
  66. FINKE G., ESPINOUSE M-L., JIANG H. Extensions of the flowshop model: job dependent capacities, job overlapping and job deterioration. EURO XV, Barcelone, 1997.
  67. BLAZEWICZ J., FINKE G., ESPINOUSE M-L., PAWLAK G. Scheduling tasks and vehicles in a multistage FMS. INFORMS, San Diego, 1997.
  68. BOURAS A., FINKE G. Low Rank Quadratic Assignment Problems. International Symposium on Mathematical Programming (ISMP 97), Lausanne, 1997.
  69. FINKE G., BRAUNER N. On the one-cycle conjecture in robotic cells. Scheduling in Computer and Manufacturing Systems. International Conference and Research Center for Computer Science, Dagstuhl, Germany, 1997.
  70. FINKE G., BRAUNER N. New Theoretical Results on Robotic Flowshops. International Symposium on Mathematical Programming (ISMP 97), Lausanne, 1997.
  71. BLAZEWICZ J., FINKE G., ESPINOUSE M-L., PAWLAK G. Scheduling vehicles in a cyclic flexible flow shop. The 4th Conference of the Association of Asian-Pacific OR Societies, Melbourne, Nov. 30-Dec. 4, 1997.
  72. FLIPO C., FINKE G. Modélisation intégrant production et distribution. 1er Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision, Paris, 14-16 janvier 1998.
  73. BRAUNER N., FINKE G. Gestion d’une ressource de transport bidirectionnelle dans un flow-shop robotisé. 1er Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision, Paris, 14-16 janvier 1998.
  74. ESPINOUSE M.-L., FINKE G. Stratégies de pilotage de chariots filoguidés dans un flowshop hybride. 1er Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision, Paris, 14-16 janvier 1998.
  75. FINKE G. Combinatorial models in manufacturing. 3-ème cycle romand de recherche opérationnelle. Séminaire de printemps, Zinal, Suisse, 1-5 mars 1998. (Conférencier invité)
  76. BRAUNER N., ESPINOUSE M.-L., FINKE G., FLIPO C. Méthodes de partitionnement en cliques appliquées au poinçonnage de tôles. FRANCORO II, Deuxièmes Journées Francophones de Recherche Opérationnelle, Sousse, Tunisie, 1998.
  77. BRAUNER N., FINKE G. Cyclic production in robotic cells. CO 98, International Symposium on Combinatorial Optimization, Brussels, Belgium, 1998.
  78. FLIPO C., BRAUNER N., ESPINOUSE M.-L., FINKE G. A clique partitioning problem with application to the sheet metal industry. CO 98, International Symposium on Combinatorial Optimization, Brussels, Belgium, 1998.
  79. ESPINOUSE M.-L., BLAZEWICZ J., FINKE G., PAWLAK G. AGV Routing Strategies in Flexible Flow Lines. INFORMS, Tel Aviv, Israel, 1998.
  80. FINKE G., FLIPO C. Integrated Production-Distribution Model in Manufacturing. INFORMS, Tel Aviv, Israel, 1998.
  81. BLAZEWICZ J., ESPINOUSE M.-L., FINKE G., PAWLAK G. Scheduling tasks and vehicles in Flexible Manufacturing Systems. ECCO XI, Copenhague, Danemark, 1998.
  82. BRAUNER N., FINKE G. Ordonnancements cycliques dans une cellule robotisée sans espaces de stockage. ROADEF 99, 2e Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision, p.174, Autrans-Grenoble, 13-15 janvier 1999.
  83. BRAUNER N., DHAENENS-FLIPO C., ESPINOUSE M.-L, FINKE G., GAVRA-NOVIC H. Poinçonnage multi-tête : modélisation et optimisation par les graphes. ROADEF 99, 2e Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision, p.110-111, Autrans-Grenoble, 13-15 janvier 1999.
  84. OULAMARA A., JIANG H., FINKE G. Flow shop avec détérioration de tâches. ROADEF 99, 2e Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision, p.65, Autrans-Grenoble, 13-15 janvier 1999.
  85. FINKE G. Scheduling with compatibility graphs. ECCO XII, Bendor, France, 27-29 mai 1999.
  86. PAWLAK G., BLAZEWICZ J., FINKE G., ESPINOUSE M.-L. Scheduling tasks and vehicles in FMSs – a network flow model. SOR'99, Symposium on Operations Research, Magdeburg, 1999.
  87. FINKE G., BRAUNER N. Scheduling in robotic cells. SOR'99, Symposium on Operations Research, Magdeburg, 1999.
  88. BLAZEWICZ J., ESPINOUSE M.-L., FINKE G., PAWLAK G. Network flow model - Scheduling tasks and vehicles in FMSs. Conference EURO PRIME I, Warsaw 1999.
  89. BLAZEWICZ J., ESPINOUSE M.-L., FINKE G., PAWLAK G. Network flow model for FMS with cyclic transportation system. Fourth Workshop on Models and Algorithms for Planning and Scheduling Problems – MAPSP’99, Renesse, The Netherlands, 1999.
  90. BRAUNER N., FINKE G. One-cycle complexity in robotic flow-shops. Scheduling in Computer and Manufacturing Systems. International Conference and Research Center for Computer Science, Dagstuhl, Germany, 1999.